Hainan western railway today since commissioning Total length of 345 km

Temps:

24 Nov,2015


Take the high-speed rail travel around hainan island will become a reality! The reporter learns from the guangzhou railway group, after completing alignment joint-test project, hainan western railway in no-load train commissioning stage today, the daily maximum of 20 operation test the emu train trips, is expected to be fully operational by the end of the year. Hainan island, the high-speed rail will achieve complete closed loop, marked the our country and even the world's first "around the island high-speed" will be the official opening, hainan will form "around the island for three hours traffic circle", realize the city island.
Learned, hainan western railway commissioning will be divided into two phases, the first stage since November 20, the train running parameters test, the second stage since November 26 operation no-load test emu train, also have equipment reinforcement, fault simulation, drill, etc.
The total length of 345 km, hainan western trunk line along the west coast in hainan island after ChengMai, high velocity, danzhou, ChangJiang, Oriental, ledong six cities and counties, all have 16 stations, respectively, in the existing haikou and sanya stand with hainan east ring railway form a closed loop. The project completed in September 2013, the design speed of 200 km/h.